Rolater Road / Valleybrook Drive Improvements
|
| Location:
|
Frisco, Texas
|
Client
Contact: |
Mr. Richard Wilkinson
6942 Maple Street
Frisco, Texas 75034
(469)-633-6000
|
| Client:
|
Frisco I.S.D.
|
| Design:
|
July 2005 – Oct 2005
|
| Construction: |
Nov 2005 – June 2006 |
Contractor:
|
Mario Sinacola & Sons, Inc.
|
| Design Team:
|
Chad A. Pendley
John Elliott
J. Don Wortham
Brian E. Nelson
|
Construction Cost: |
$1,446,851 |
|
Project Description: |
|
The Rolater Road and Valleybrook Drive project is currently under construction adjacent to the FISD Liberty High School site. The project includes approximately 2,200 linear feet of the two westbound lanes of Rolater Road and 1,000 linear feet of 37 foot wide collector street. The design of the storm sewer system includes over 1,800 linear feet of main trunk line ranging in size from 21” RCP to 60” RCP. Water Line improvements called for over 1,150 linear feet of 12” Water Line. In addition, the project includes over 1,360 linear feet of 15” Sanitary Sewer which required an aerial crossing over West Rowlett Creek to tie into the existing 27” Sanitary Interceptor on the west side. |