RLK Engineering .::. The one to count on for a job well done
RLK Engineering .::. The one to count on for a job well done
Search
Home
Projects
History
Services
News
Clients
Contact
Sitemap | Contact | FAQ
RLK Engineering Projects

Powered by AlbumOnNet     Get a license now!

 Independence Parkway Construction North (Eldorado Pkwy to City Limits)
Location: Frisco, Texas Client Contact: Mrs. Cissy Sylo, P.E.
6101 Frisco Square Blvd
Frisco, Texas 75034
(972)-292-5400

Mr. Richard Wilkinson
6942 Maple Street
Frisco, Texas 75034
(469)-633-6000
Client: City of Frisco/ Frisco I.S.D.
Design: Mar 2004 to May 2004
Construction: June 2004 to May 2005 Contractor: Charter Builders - (JRJ Paving / KCK Construction)
Design Team: Chad A. Pendley, John Elliott, Frank Canedy Construction Cost:
$1,603,000
Project Description:
The Independence Parkway Construction North project is a joint effort between the City of Frisco and Frisco ISD to provide thoroughfare access to the Sam Roach Middle. The project included approximately 2,800 linear feet of 2-lane and 4-lane (ultimate 6-lane) divided roadway, storm sewer, water, sanitary sewer, and illumination design. The design of the storm sewer system includes over 2800 linear feet of main trunk line ranging in size from 21” RCP to 42” RCP. The water line design called for over 1,900 linear feet of 36” Ductile Iron pipe and over 2,900 linear feet of 12” PVC pipe. The sanitary sewer system included over 4,600 linear feet of new pipe ranging from 8” to 12” diameter and presented challenges to avoid conflict with an existing 20” high pressure gas transmission line at two separate locations. Legal descriptions, exhibits, and maps were also provided for right-of-way and easement acquisition.

©2005 RLK Engineering. All Rights Reserved. Terms of Use || Privacy Policy