Legacy Drive Construction – Main Street to Veneto Drive
|
| Location:
|
Frisco, Texas
|
Client
Contact: |
Mrs. Cissy Sylo, P.E.
6101 Frisco Square Blvd
Frisco, Texas 75034
(972)-292-5400
Mr. Richard Wilkinson
6942 Maple Street
Frisco, Texas 75034
(469)-633-6000
|
| Client:
|
City of Frisco/ Frisco I.S.D.
|
| Design:
|
Mar 2003 to Mar 2004
|
| Construction: |
May 2004 to July 2005 |
Contractor:
|
Mario Sinacola & Sons, Inc.
|
| Design Team:
|
Chad A. Pendley
John Elliott
Seth Kelly
Steve Hutchings
|
Construction Cost: |
$6,824,016 |
|
Project Description: |
|
The Legacy Drive Construction project is a joint effort between the City of Frisco and Frisco ISD to provide thoroughfare access to the fast growing area of west Frisco, including the proposed Frisco High School #3. The project includes approximately 1.5 miles of 4-lane (ultimate 6-lane) divided roadway, storm sewer, bridge, water, and illumination. The design of the storm sewer system includes over one mile of main trunk line ranging in size from 21” RCP to 9’x6’ RCB. Two 300’ (4-75’span) bridge structures were required to accommodate travel over Cottonwood Branch. In addition, three separate concrete box culverts, ranging in size from an 8’x4’ SBC to a 3-10’x5’ MBC, were required. The water line design called for over 7,700 linear feet of 36” Ductile Iron pipe. Legal descriptions, exhibits, and maps were also provided for right-of-way and easement acquisition. |